Basic Member
Since Nov, 2020
After the dominant load has been calculated, the equipment can be specified. The efficiency of the equipment affects the loop dimensions. The ground loop should be thought of as your oil tank, and that it has access to sufficient heat /cool to get the building through the dominant period.…