Reline America, Inc.® is the exclusive North American manufacturer of ALPHALINER™ (formerly known as Blue-Tek™) ultra-violet glass reinforced cured-in-place pipe (UV CIPP). ALPHALINER™ is available for non-pressurized application needs in 6 to 54 inch diameter pipe. In addition to supplying this engineered CIPP liner solution, Reline America® also manufactures a state of the art UV-light installation equipment system specific to ALPHALINER™ that incorporates the award winning QUALITY-TRACKER-SYSTEM™.
Across North America, pipes and culverts are increasingly in need of renewal. Community and environmental impact are substantially reduced with the use of a trenchless pipeline rehabilitation solution compared to pipeline cut and cover type replacement projects.
In 1998, Don Pleasants and Mike Burkhard agreed to pursue a premier lining system to bring to North America. In 2005, they secured the North American rights to a UV CIPP lining system product along with installation equipment, establishing Reline America® in southwestern Virginia.
The Alphaliner™ (formerly known as Blue-Tek™) and Alphaliner® installation equipment are manufactured solely in the USA at the Virginia plant.
Since that time, Reline America® has earned the distinction of being the first North American Company to manufacturer for installation of over one million feet of UV CIPP liner in North America.
Reline America® has recently agreed to cooperate with Reline Europe and Reline Japan in the further development and installation of their products worldwide. Their business philosophy integrates the concept of continual product development and high quality manufacturing.
Reline America® has secured its place as the leading North American manufacturer of cutting-edge ultraviolet light cured trenchless pipeline rehabilitation products.
Our manufacturing facility in Saltville, VA houses not only our UV-CIPP tube manufacturing lines; but also a state of the art testing laboratory to support our QA/QC program, our ISO 9001:2008 Certified Quality Management System, a machine shop to fabricate unique manufacturing and installation equipment components, an installation equipment maintenance and repair shop, and a very busy product improvement/development department.
Storm drain or sewer line rehabilitation with Reline America®’s ALPHALINER™ can be installed either by a certified contractor or using an owner's in-house crews with little to no interruption to the community. The simplicity of the installation process owing to the innovative equipment package and training program supplied by Reline America® to its installers creates the perfect situation for large contractor projects and just-in-time self-fulfillment type work orders.
When working in and around the general public the ALPHALINER™ system offers several unique benefits not available with conventional heat-cured CIPP systems. These are:
The small worksite footprint is a product of the shipping requirements of the resin saturated tube and the small box size of the UV-light curing equipment. The resin-saturated ALPHALINER™ tube is typically delivered folded in a wooden shipping box in a non-refrigerated box truck. The liner being installed is quickly unloaded and winched into the host pipe scheduled for renewal.
There are no monstrous 100-hp hot water or steam generating boilers nor any 250 to 1100 CFM air compressor(s) sitting on the installation access point for hours to initiate and finish the curing of the resin and then bringing down the temperature of the liner to create a stable CIPP. The ALPHALINER™ equipment consists of a modest CFM air compressor to keep the liner firmly inflated to the host pipe's geometry and a quiet electrical generator to produce the electricity for the UV-light train. On a typical 400-foot reach of 8-inch pipe, the light-curing process can be completed in a little less than 75 minutes.
Integral to the UV-light cure CIPP process, the resin saturated tube comes complete with an outer plastic membrane, or foil, that is designed to protect it from exposure to UV-light from the atmosphere and to facilitate its pull-in place installation practice. The resin-saturated tube also comes with an inner, clear plastic membrane designed to allow for the tube's inflation for the curing process. These inner and outer sophisticated foils are composed of several layers of materials designed to perform these functions and to contain the styrene odors that might otherwise be liberated during the installation process.
A fully hardened liner cuts quickly and cleanly. The short UV-exposure time required of the resin system and the relative immunity of the curing process to cold ground heat sinks, assures this full hardening is taking place at all times of the year.
In addition to the containment of the resin system by the two foils, the resin is thickened following the saturation process which means much less opportunity for resin to be dropped on the ground or to flow down the next reach of the pipeline. This makes for a very clean worksite.
Company Name | Reline America, Inc |
Business Category | |
Address | 116 Battleground Avenue Saltville Virginia United States ZIP: VA 24370 |
President | NA |
Year Established | NA |
Employees | NA |
Memberships | NA |
Hours of Operation | NA |
Phone Number | Locked content | Subscribe to view |
Fax Number | Locked content | |
Locked content | ||
Website | Locked content |