Enviro-Klean Remediation Group IncPO Box 75004 White Rock, BC, V4B 5L5, PO Box 75004 White Rock, BC, V4B 5L5, British Columbia, Canada
Since Mar, 2015
HISTORY: 1980'S TO PRESENT
Back in the 1980's, manufacturers of asphalt plants began modifying their equipment to remediate hydrocarbon contaminated soils. The process was effective, however, fuel consumption and undesirable air emissions presented significant challenges.
As a result, a group of engineers joined forces under the name Enviro-Klean and began to explore alternate soil heating methods.
They created the unique Enviro-Klean soil curtain design, which has been modified and improved through 4 generations.
Each new enhancement has increased the throughput, reduced energy consumption and improved air emissions. Today's model, the KM-4, is a testimony to the company's unceasing pursuit of perfection.
CERTIFIED ENGINEERING AND MANUFACTURING
Enviro-Klean equipment is engineered and manufactured in North America, and meets UL, CSA and European CE standards.
All machine components are designed for years of productive service. (The KM-2 pictured on the right was built in 1994 and is still in operation.) The drives and gear boxes used to power the screw conveyors and augers are top-of-the line Eurodrive and Baldor. The electronics are Siemens. The fuel system is Eclipse. The heavy-duty trailers feature air-ride suspensions. Enviro-Klean is committed to providing competitive, state-of-the-art thermal remediation equipment that meets or exceed the toughest environmental standards world-wide.
ENVIRO-KLEAN SERVICES INCLUDE:
- Set-up Procedures
- Operations Training
- Maintenance Training
- Remote Monitoring
- Technical Support
SET-UP PROCEDURES
Mob/Demob and site preparation costs are relative to the region of remediation, and having the KM-4 and feed system each on its own trailer, contributes to keeping the costs down. Because the KM-4 is self contained on one trailer, the site set-up time can be accomplished in approximately one day allowing for efficient start up responses.
A Brief Description of the Site Set-up Involves:
Position the control house and feed system. Bolt the feed hopper to the preheater, the stack for the air discharge, and the pugmill for the discharge soil. Connect the fuel lines that use either propane, natural gas, or #2 diesel fuel. Connect electrical power through cables on the main trailer hooked up to the control house which is supplied from the main grid power supply, or genset.
OPERATIONS TRAINING
Operations for the KM-4 will require an operator, loader and helper for each shift. Training is available for current employees, with additional follow up training for the one year warranty duration, to ensure successful remediation. The training schedule and the length of training will consist of 2 weeks located at the remediation site. Our training instructors look forward to meeting your staff while providing confidence in operations to each of the positions held by your selected employees.
MAINTENANCE TRAINING
Along with maintenance training for your staff, a maintenance schedule will accompany the KM-4 consisting of detailed machine checks and servicing details. Proper procedures and documented scheduled maintenance checks will be required to fulfill Enviro-Klean’s warranty agreement.
REMOTE MONITORING
Enviro-Klean's KM-4 comes equipped with an on board monitoring system set up to deliver daily, weekly, or monthly reports to the owner, operator, and Enviro-Klean staff to help ensure proper operating procedures. Through the analyzing of reports and data gathered from the KM-4's operating history, remote monitoring can provide maximum throughput as well as documentation to satisfy environmental and governmental requirements.
TECHNICAL SUPPORT
During the one year warranty duration, Enviro-Klean will provide technical support with its global toll free number which will be made available to your company at no extra cost to keep your operations running smoothly. Technical Support is offered in areas such as mechanical troubleshooting, throughput management, and computer parameters.
Company Name | Enviro-Klean Remediation Group Inc |
Business Category | |
Address | PO Box 75004 White Rock, BC, V4B 5L5 PO Box 75004 White Rock, BC, V4B 5L5 British Columbia Canada |
President | Lawrence Hamilton |
Year Established | NA |
Employees | NA |
Memberships | NA |
Hours of Operation | NA |
- Operations Training